How to choose a concrete mixing station

Dec 21, 2022 Lăsaţi un mesaj

 

EP Machinery hereby reminds all users to pay attention to the following issues when purchasing a mixing plant production line:

 

1. Expected problems in production capacity selection

 

Users should choose the commercial mixing plant production line that suits them according to the company's early development plan, so as to have considerable production capacity. Some enterprises lack foresight. Due to the influence of business and capital at the beginning of production, the vehicle transportation equipment may be limited. However, with the improvement of the company's production capacity, the continuous addition of follow-up equipment is the general trend. When a certain amount of equipment is purchased, the production line will be expanded according to the need or the original production line will be demolished to build a larger one. There are many companies like this. Therefore, users need to ensure that they choose the equipment that meets their own production capacity in light of the actual situation when purchasing a commercial mixing plant.

 

2. The reasonable trend of the production line

 

Based on years of industry experience, it is more appropriate to choose two production lines for commercial mixing plants. First, the double production lines are arranged in a compact structure, and the overall appearance is equipped with a closed structure; then, the installation of two production lines in the factory area can facilitate mixing. The sorting and waiting of transport vehicles, if there are more than two production lines in the factory area, there will be no more situations where drivers have difficulty parking on the site, crossing back, turning around in the site, or traffic jams.

 

3. Site positioning of the production line

 

In the factory area, the location of the production line must be determined first. According to the principle of traffic and road convergence, all roads must circulate smoothly and there must be no dead-end road regulations, which means that there must be parking spaces in front of the mixing station, and there must be powder parking spaces on the left and right. and channel. And the area around the aggregate transfer warehouse must also be kept clear to facilitate subsequent equipment repairs.

 